2011

Date

Activity

December 31, 2011Article on Belchertown-News.com web site published about Required Inspections Of Upper Bondsville Dam Not Being Conducted.
August 11, 2011Article in Springfield Republican about new state legislation which establishes loan fund to maintain dams across Massachusetts.
April 11, 2011Study commissioned by the BLT in December 2010 looking at funding options for saving or removing the dam publicly released after being reviewed by the Board of Directors.
April 4, 2011Article in Springfield Republican about lawsuit filed against the BLT by the Swift River Preservation Association and landowners on the Swift River.
April 2, 2011Complaint filed against the BLT by the Swift River Preservation Association and landowners on the Swift River to stop demolition of the dam and preserve the lake-like impoundment upstream of the dam.
March 9, 2011PVPC study on funding options for the Upper Bondsville Dam presented to the Belchertown Land Trust at its regular monthly meeting. Report was taken under advisement by the board until it had time to review the contents before public release.
February 16, 2011Article in the Springfield Republican (headline: "Belchertown Land Trust leaders start work on plan to save Upper Bondsville Dam")
February 16, 2011State Senator Stan Rosenberg meets with BLT board to discuss options for saving the Upper Bondsville Dam.
January 4, 2011Meeting hosted by Belchertown Selectman Ken Elstein to look at options for saving the dam
January 4, 2011Article in the Springfield Republican
January 6, 2011Article in the Hampshire Gazette (headline: "Belchertown dam proponents asked to join forces")
January 9, 2011FAQs published on the BLT web site
January 19, 2011Article in the Springfield Republican about the Swift River Preservation Association
January 20, 2011Article in the Hampshire Gazette (headline: "New Swift River Preservation Association to meet")

2010

Date

Activity

December 28, 2010Article in the Springfield Republican
December 20, 2010Article in the Hampshire Gazette (headline: "A tale of two dams")
December 15, 2010Article in the Springfield Republican
December 14, 2010Article in the Hampshire Gazette (headline: "Proposed dam demolition elicits strong feelings")
December 13, 2010Article in the Hampshire Gazette (headline: "Belchertown Land Trust to decide dam removal")
December 7, 2010Article in the Springfield Republican (archived article not available)
November 10, 2010BLT Board of Directors approves contract with PVPC to research funding sources for both repair or removal of the dam
October 12, 2010Article in the Springfield Republican (archived article not available)
October 6, 2010Article in the Springfield Republican (archived article not available)
September 30, 2010Article in the Hampshire Gazette (headline: "Historic dam on Belchertown docket: Ideas sought on fate of Bondsville Dam")
September 30, 2010Article in the Springfield Republican
September 30, 2010PVPC and BLT hold public meeting to present consultant findings
September 27, 2010DCR rejects Fay Engineering Services evaluation of the dam
September 22, 2010Article in the Springfield Republican
September 7, 2010Article in the Springfield Republican
September 2010Informational booth at the 2010 Belchertown Fair
September 2010Local and regional newspapers publish articles regarding September 30 public meeting
August 21, 2010Article in the Springfield Republican
August 14, 2010Article in the Springfield Republican
July 2010Ware River News, Journal Register, and the Belchertown Sentinel publish guest columns describing BLT dam repair and removal considerations
June 2010Consultants complete assessment work and BLT releases report
March 2010PVPC and BLT hire consultant for development of cost estimates on repair vs. removal; delineation for upstream extent of impoundment; see PVPC Media Release (dated 3/25/10)
February 11, 2010Article in Hampshire Gazette (headline: "Around Belchertown: Study upgrades dam status")
February 8, 2010BLT releases follow up Phase I Inspection Report
January 2010PVPC organizes series of two informational sessions for BLT board with engineers on dam repair and maintenance considerations and removal considerations
January 2010Office of Dam Safety receives follow up Phase 1 inspection and must now make determination in reconciling differences between the two inspection reports

2009

Date

Activity

December 2009Fay Engineering conducts follow up Phase 1 inspection on dam
December 4, 2009Article in the Hampshire Gazette (headline: "Around Belchertown: Bondsville dam repair timetable 'unrealistic' ")
December 1, 2009Article in the Springfield Republican (archived article not available)
November 30, 2009 Article in the Springfield Republican (archived article not available)
November 30, 2009BLT receives extension from DCR, which contains requirements for a series of conditional inspections
November 19, 2009BLT sends letter to DCR requesting extension on dam safety order
November 6, 2009Area legislators send letter to DCR requesting extension on February 2008 dam safety order
October 27, 2009BLT holds Annual Meeting
October 24, 2009Article in the Hampshire Gazette
October 19, 2009Article in the Springfield Republican
October 13, 2009Article in the Springfield Republican
October 3, 2009Article in the Hampshire Gazette
October 1, 2009PVPC and BLT hold public meeting at Belchertown High School to describe issues and hear from community. Meeting attended by approximately 115 people.
September 2009Informational booth at Belchertown Fair
September 2009PVPC and BLT begin exploration of other possible owners, conducting meetings with hydropower developers and communicating with state agencies
August 2009PVPC organizes series of three meetings with BLT representatives and town officials from Palmer, Ware, and Belchertown to outline the project and hear concerns
July 2009PVPC receives MET grant and has initial meeting with BLT Board
May 5, 2009BLT issues Tighe & Bond report on Phase 1 inspection
May 2009Belchertown Town Meeting approves dam inspection funds by BLT. DCR contracts with Tighe & Bond to conduct a Phase 1 inspection while BLT applies for CPA funds to reimburse DCR.
March 10, 2009Office of Dam Safety Director William Salomaa meets with BLT board
March 2009 PVPC applies for grant from the Massachusetts Environmental Trust to help BLT review options
March 2009Engineers Tighe & Bond conduct Phase 1 Inspection of dam
March 2009Springfield Republican reporter contacts DCR regarding the inability of BLT to get meeting with Office of Dam Safety staff
February 28, 2009 Article in the Springfield Republican
February 2009BLT sends letter to Office of Dam Safety requesting meeting -- no success

2008

Date

Activity

September 2008State legislators issue letter to Office of Dam Safety requesting a meeting be arranged between Dam Safety and BLT
August 13, 2008BLT initiates meeting regarding dam with Representative Smola and Senate/House legislative aides and Belchertown Selectman Rocanti
June - August 2008BLT contacts all area state legislators seeking assistance to secure a meeting with Office of Dam Safety
May 2008BLT sends letter to Office of Dam Safety requesting meeting -- no success
February 28, 2008Article in the Springfield Republican (archived article not available)
February 22, 2008MA Department of Conservation and Recreation (DCR) Office of Dam Safety issues certificate of non-compliance stating that Bondsville Upper Dam does not meet accepted dam safety standards and is a potential threat to public safety

NOTE: This timeline does not include articles that appeared in The Sentinel.

©  2011 Belchertown Land Trust | P.O. Box 152 | Belchertown, MA 01007  All rights reserved.

413-28BTOWN (or 413-282-8696) | info@belchertownlandtrust.org